Grandfather Falls Hydro Plant Penstock Replacement

Location

Irma, WI

Value

$10 M

Delivery Method

  • Design-Bid-Build

Client Type

Industrial

Project Type

  • Pipeline (Penstock)
156" & 132" diameter welded steel pipe 
30,000+ man-hours worked with no safety recordable accidents 
&#9733 Won the 2017 Steel Water Pipeline Project of the Year by the Steel Plate Fabricators Association 

The Grandfather Falls Hydroelectric Power Plant is located 13 miles north of Merrill, Wisconsin, on the Wisconsin River and has two units with a total of 17.1 MW of generation capacity. This project, constructed for Wisconsin Public Service (WEC Energy Group), included the demolition and replacement of existing dual wood stave penstocks. Leakage from these pipes had increased four-fold over the past two years and was occurring between the wood staves and butt joints. Each new welded steel penstock waterline stretches 1,300 LF with one pipe 156″ and the other pipe 132″ in diameter. The project also included storm drainage piping, concrete thrust blocks, coatings, and site restoration.