Water Treatment Plant No. 2 Phase II
Location
Midlothian, TXValue
$18 MDelivery Method
- CMAR
Client Type
MunicipalProject Type
- Plant
9 MGD plant
Reverse osmosis membrane system
24 bid packages encouraged local participation on the project
Due to the growth in the Midlothian area, there has been an increasing demand for water, which required the construction of this new 9 MGD plant. The scope of work included a sedimentation basin, chemical building, recycle pump station, three sludge lagoons, raw water control building, administration building with membrane process equipment, administrative offices, laboratory, meeting space and shop, electrical, instrumentation and controls, mechanical work, site work, and a raw water pipeline that tapped a 72” and 90” Tarrant Regional Water District raw waterline. The project included a Biwater RO system with Toray membranes.